I visited JFK on Saturday and the work on the Bay Runway really seems to be coming along. It seems almost complete. Is it possible it could re-open before July 1? Any news?
I visited JFK on Saturday and the work on the Bay Runway really seems to be coming along. It seems almost complete. Is it possible it could re-open before July 1? Any news?
Funny you say that....stay tuned!
Email me anytime at [email protected].
Paving looked complete but I couldn't see the length of the entire runway from my location. Hope to hear some good news soon.
It better open before July 1st or the construction company gets fined $50,000 a minute by the Port Authority for being behind schedule.Originally Posted by Speedbird1
Also note 31L/13R can be used for departures/arrivals (Visual/ILS 31L, depart 31L intersection Kilo-Kilo, Visual/depart 13R) when the first phase is complete before July 1st.
The construction workers will be protected by a temporary blast fence.
They will then finish resurfacing the runway from the intersection of Kilo-Kilo to the SE end of the runway.
Aspires to become an Air Traffic Controller at Kennedy Tower.
http://web01.jetphotos.net/showphotos.php?userid=31094
I was on the construction site on Saturday. The project is on schedule. Part of 31L will be given back to JFK on July 1st or before, however only for take offs. They don't want planes landing over an active construction zone, makes sense. The rest of the runway will be completed by Nov with 22R and 31L being closed at the same time towards the end of Sept/Oct for exactly 15 days. The only part of 31L that will not be ready by July are all the new taxiways, some have not been laid as of yet, right now 2 turn offs are complete.
btw the new runway is concrete vs. asphalt..which part of it has already been replaced due to cracking.