I came to LGA to see my friend off at UAL yesterday. Unfortunately, after a several hour wait, his flight was finally cancelled; although the aircraft was de-iced. I had an enjoyable time watching the snow clearing operations. At one point, the visibility seemed to be zero with a less than 1000' ceiling. There were numerous plows and other equipment in use. The de-icing operation, using what ressembles a cherry picker, was also very interesting. As the snow accumulated, I noticed that Rwy 4/22 was closed as all arrivals came in on Rwy 13 instead. Is it normal for LGA to go to a 1-Runway Operation during snow?



Reply With Quote




















Bookmarks