Results 1 to 12 of 12

Thread: 787 First Flight Delayed Indefinitely

  1. #1
    Moderator Matt Molnar's Avatar
    Join Date
    Apr 2005
    Location
    New York
    Posts
    9,302

    787 First Flight Delayed Indefinitely

    Boeing press release:
    Boeing Postpones 787 First Flight

    EVERETT, Wash., June 23 /PRNewswire-FirstCall/ -- Boeing (NYSE: BA) today announced that first flight of the 787 Dreamliner will be postponed due to a need to reinforce an area within the side-of-body section of the aircraft.

    The need was identified during the recent regularly scheduled tests on the full-scale static test airplane. Preliminary analysis indicated that flight test could proceed this month as planned. However, after further testing and consideration of possible modified flight test plans, the decision was made late last week that first flight should instead be postponed until productive flight testing could occur.

    First flight and first delivery will be rescheduled following the final determination of the required modification and testing plan. It will be several weeks before the new schedule is available. The 787 team will continue with other aspects of testing on Airplane #1, including final gauntlet testing and low-speed taxiing. Work will also continue on the other five flight test aircraft and the subsequent aircraft in the production system.

    Scott Carson, president and CEO of Boeing Commercial Airplanes said a team of experts has already identified several potential solutions.

    "Consideration was given to a temporary solution that would allow us to fly as scheduled, but we ultimately concluded that the right thing was to develop, design, test and incorporate a permanent modification to the localized area requiring reinforcement. Structural modifications like these are not uncommon in the development of new airplanes, and this is not an issue related to our choice of materials or the assembly and installation work of our team," Carson said.

    Boeing's financial guidance will be updated to reflect any impact of these changes when the company issues its second quarter 2009 earnings report in July.

    Boeing will hold a conference call with Carson, Pat Shanahan, vice president and general manager of Airplane Programs, and Scott Fancher, vice president and general manager of the 787 program, to discuss the 787 program today at 10:00 a.m. EDT, 7:00 a.m., PDT. A webcast of that call will be accessible at www.boeing.com.
    Ladies and gentlemen, this is your captain speaking. We have a small problem.
    All four engines have stopped. We are doing our damnedest to get them under control.
    I trust you are not in too much distress. —Captain Eric Moody, British Airways Flight 9

  2. #2
    Senior Member FlyingColors's Avatar
    Join Date
    Apr 2005
    Location
    New Jersey
    Posts
    847

    Re: 787 First Flight Delayed Indefinitely

    Crap :(
    "my finger on the shutter button, while my eye is over my shoulder"

  3. #3
    Senior Member sporky's Avatar
    Join Date
    Mar 2009
    Location
    DFW Area
    Posts
    305

    Re: 787 First Flight Delayed Indefinitely

    Crap
    I will second that! Damn!

  4. #4
    Senior Member
    Join Date
    Jun 2005
    Location
    Huntington
    Posts
    344

    Re: 787 First Flight Delayed Indefinitely

    It could have been worse, you could've been one of the people who flew out there to see the first flight in person.

  5. #5
    Senior Member sporky's Avatar
    Join Date
    Mar 2009
    Location
    DFW Area
    Posts
    305

    Re: 787 First Flight Delayed Indefinitely

    True True! Saved me about a 15 minute drive, but now I have to go to work instead!

  6. #6
    Senior Member Delta777LR's Avatar
    Join Date
    Sep 2006
    Location
    Poughkeepsie, New York, United States
    Posts
    2,844

    Re: 787 First Flight Delayed Indefinitely

    thats crazy!! But in a way I expected the first flight to be delayed
    Sergio has been a huge Delta Air Lines fan since 1992!!

    Sergio Cardona

    http://www.jetphotos.net/showphotos....e=1&display=15

  7. #7
    Moderator Matt Molnar's Avatar
    Join Date
    Apr 2005
    Location
    New York
    Posts
    9,302

    Re: 787 First Flight Delayed Indefinitely

    FlightBlogger breaks down the problem.
    Ladies and gentlemen, this is your captain speaking. We have a small problem.
    All four engines have stopped. We are doing our damnedest to get them under control.
    I trust you are not in too much distress. —Captain Eric Moody, British Airways Flight 9

  8. #8
    Senior Member
    Join Date
    Apr 2005
    Posts
    8,285

    Re: 787 First Flight Delayed Indefinitely

    Now the layman translation..... ;)

    1. The damn will wing break off ;)

    2. We have no clue how to fix it yet.

    3. Hmmm composites aren't as strong as metal.

    4. Beats the $hit out of us when it will fly.

    5. Oh yeah you probably should have sold your Boeing stock yesterday.

  9. #9
    Moderator Matt Molnar's Avatar
    Join Date
    Apr 2005
    Location
    New York
    Posts
    9,302

    Re: 787 First Flight Delayed Indefinitely

    Quote Originally Posted by T-Bird76
    Now the layman translation..... ;)

    1. The damn will wing break off ;)
    It sounds more like the wing flex will damage the fuselage, which is almost as bad, I suppose.
    Ladies and gentlemen, this is your captain speaking. We have a small problem.
    All four engines have stopped. We are doing our damnedest to get them under control.
    I trust you are not in too much distress. —Captain Eric Moody, British Airways Flight 9

  10. #10
    Senior Member nikon50bigma's Avatar
    Join Date
    Dec 2006
    Location
    Staten Island
    Posts
    920

    Re: 787 First Flight Delayed Indefinitely

    Quote Originally Posted by T-Bird76
    Now the layman translation..... ;)

    1. The damn will wing break off ;)

    2. We have no clue how to fix it yet.

    3. Hmmm composites aren't as strong as metal.

    4. Beats the $hit out of us when it will fly.

    5. Oh yeah you probably should have sold your Boeing stock yesterday.
    LMAO Tommy!
    Patrick O --- Staten Island, NY

  11. #11
    Moderator Matt Molnar's Avatar
    Join Date
    Apr 2005
    Location
    New York
    Posts
    9,302

    Re: 787 First Flight Delayed Indefinitely

    Here is a more detailed explanation of the problem: http://www.flightglobal.com/blogs/fligh ... ng-th.html
    Ladies and gentlemen, this is your captain speaking. We have a small problem.
    All four engines have stopped. We are doing our damnedest to get them under control.
    I trust you are not in too much distress. —Captain Eric Moody, British Airways Flight 9

  12. #12
    Senior Member Fighting_falcon_51's Avatar
    Join Date
    Mar 2009
    Location
    Copiague, NY
    Posts
    1,211

    Re: 787 First Flight Delayed Indefinitely

    This stinks :(
    http://www.kjpgallery.com << Photography Collection
    http://www.nyasinfo.com << Jones Beach Airshow Information (Updates continue in November)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •